On a public tender, Adeptio d.o.o. was selected as the most favorable
bidder for the project - Design and manufacture of control cabinet for the drainage
system of the hydroelectric power plant Rijeka. The works included the
development of the Detailed Design of the control panel and measuring
equipment, the production of control panel, the development of new electrical
installations for powering the control panel, actuators and measuring
equipment, and the commissioning of the system with user training. All works
were performed respecting the agreed deadlines and strict operating
requirements while the power plant was partially operational.