On the island of Koločep near Dubrovnik, modernization of
wastewater treatment plant was performed, as well as reconstruction of existing
tanks and installation of new wastewater pre-treatment, installation of new
pumps, propellers, mixers, dispensers, measuring equipment, float switches, new
cables and cable ducts, and associated automation and accessories.
As part of the reconstruction of the plant, the following
was performed:
Creation of electrical diagrams
Production and installation of automation cabinets
Development of PLC programs and SCADA systems for automation
of wastewater treatment processes
An HSPA router has been installed to remotely monitor and
control the device
Cables and cable ducts have been installed
Grounding is installed
Measuring devices were installed and parameterized (liquid
levels, pipeline pressure, oxygen level and temperature in the tanks, liquid
turbidity)
Installations were tested, the functionality of all devices
was checked and the system was put into operation